All case studies

Illustrative · Illustrative scenario · enterprise operations & shared services

From a week of spreadsheet work to a pack drafted before the meeting.

Enterprise operations · multi-site management reporting

A multi-site operations team replaces a hand-built monthly deck with AI-drafted report packs: requested in plain language, compared with the previous period, a page per site, reviewed by a person and scheduled for delivery.

Illustrative scenario. Built from how DeepQ is deployed; the bank and the figures are representative, not a measured customer result. Ask us for a reference call with a bank running DeepQ.

Representative figures · illustrative scenario

Day 1

Management pack drafted, representative timing

−80%

Analyst effort per reporting cycle, representative target

In-house

No operational data leaves the data centre, representative deployment

The challenge

  • Analysts spent the first week of every month rebuilding the same deck from exports.
  • Executive questions comparing one site with another, or with last quarter, took days to answer.
  • Figures in the deck were not trusted because nobody could trace them back to the underlying records.
  • Sending operational data to an external AI service was not acceptable to the risk and compliance function.

What DeepQ put in place

  • Ready-made packs for weekly review and monthly management reporting, drafted against the previous period with an executive summary.
  • Guided prompts for site managers: choose the site and the period and run the same governed report.
  • Every figure in the narrative bound to the rows beneath it, with nothing delivered until a named reviewer approves it.
  • The reporting models run inside the organisation's own data centre, so operational data never leaves it.

What changed

  • The management pack is drafted at the start of the period and approved by a person rather than assembled by hand.
  • Executive questions are answered in the meeting, with the comparison on screen.
  • The record behind any figure is one step away, which makes the pack usable in audit and board settings.

Run the same pilot in your branch.

A pilot branch is typically live within weeks. We agree the measures first, so the result is a number, not an opinion.